Uploaded image for project: 'MariaDB Server'
  1. MariaDB Server
  2. MDEV-596

LP:1052950 - Progress report for REPAIR TABLE with MyISAM

    Details

    • Type: Task
    • Status: Open
    • Priority: Minor
    • Resolution: Unresolved
    • Fix Version/s: 10.1
    • Component/s: None
    • Labels:

      Description

      I was running a REPAIR TABLE on a MyISAM table, and to my surprise the "progress" field was stuck at 0.0. It would be great if it worked like ALTER TABLE does, and gave progress.

        Gliffy Diagrams

          Attachments

            Issue Links

              Activity

              Hide
              sheerik.cabral Sheeri K. Cabral added a comment -

              Re: Progress report for REPAIR TABLE?
              (this is on MariaDB 5.5, let me know if you need more detailed information).

              Show
              sheerik.cabral Sheeri K. Cabral added a comment - Re: Progress report for REPAIR TABLE? (this is on MariaDB 5.5, let me know if you need more detailed information).
              Hide
              ratzpo Rasmus Johansson added a comment -

              Launchpad bug id: 1052950

              Show
              ratzpo Rasmus Johansson added a comment - Launchpad bug id: 1052950
              Hide
              elenst Elena Stepanova added a comment -

              It works as described in https://kb.askmonty.org/en/progress-reporting/ – progress report on REPAIR TABLE is supported for Aria, but not MyISAM, so I'm converting it into a task (feature request).

              Show
              elenst Elena Stepanova added a comment - It works as described in https://kb.askmonty.org/en/progress-reporting/ – progress report on REPAIR TABLE is supported for Aria, but not MyISAM, so I'm converting it into a task (feature request).
              Hide
              elenst Elena Stepanova added a comment -

              Worklog #202 already describes similar plans

              Show
              elenst Elena Stepanova added a comment - Worklog #202 already describes similar plans

                People

                • Assignee:
                  Unassigned
                  Reporter:
                  sheerik.cabral Sheeri K. Cabral
                • Votes:
                  1 Vote for this issue
                  Watchers:
                  2 Start watching this issue

                  Dates

                  • Created:
                    Updated:

                    Time Tracking

                    Estimated:
                    Original Estimate - 4 hours
                    4h
                    Remaining:
                    Remaining Estimate - 4 hours
                    4h
                    Logged:
                    Time Spent - Not Specified
                    Not Specified